From March 20th to 22th, 2017, ZCPPE has participated in The 17th China International Petroleum & Petrochemical Technology and Equipment Exhibition (CIPPE2017) in New China International Exhibition Center.  CIPPE2017 had an attendance of 1,800 exhibitors and over 80,000 professional visitors from 65 countries and regions, including 18 national pavilions from USA, Germany, Canada, UK, France,.. read more →

On 4 July 2017, ZCPPE successfully conducted vibration troubleshooting for a reciprocating compressor package that was found to have excessive torsional vibration with abnormal noise in operation. After incorporating the structural design improvement of coupling proposed by ZCPPE, the compressor package came to operate smoothly without torsioanl vibration and noise issues.    FEA Model for.. read more →

On 28 May, 2017, ZCPPE and Sinopec Oilfield Equipment Corporation signed a cooperation agreement in order to cooperate in compressor optimization design, vibration analysis, package standardization, and pipeline integration management. This agreement further strengthens the win-win relationship between ZCPPE and Sinopec Oilfield Equipment Corporation, and would improve the competitive capability of both in domestic and.. read more →

On 31 March, 2017, ZCPPE and CNPC Jichai Power Equipment Company Chendu Compressor Plant signed a cooperation agreement in order to cooperate in compressor optimization design, vibration analysis, and package standardization. This agreement further strengthens the win-win relationship between ZCPPE and Chendu Compressor Plant, and would improve the competitive capability of both in domestic and.. read more →

On November 25, 2016, Mr. Tony Mann (Ariel Canadian Regional Account Manager – Technical Services), Mr. Walter Loeppky (Ariel Western Canadian Regional Manager), and Mr. Jonathon Pearson (member of the Ariel Western Canadian team) visited the ZCPPE Calgary office on the invitation of ZCPPE.  During the technical meeting, Mr. Mann introduced the recent developments of.. read more →

The compressor package was designed and manufactured by CNPC Chengdu Compressor Plant, China, with API 618 pulsation design and torsional studied completed by ZCPPE.  It has been successfully commissioned and put into operation on October 25,2016 in Donghe zone, Xinjiang Talimu oil field.  The highest discharge pressure can reach 50 Mpag while the largest flow.. read more →

Based on projects completed, ZCPPE has recently prepared and submitted the following technical papers to “Compressor” and “Compressor Technology” in China to share our design studies with our peers. Pulsation design study for gas injection compressor packages, compressor (Chinese), Vol 11, 2016 Skid structural study for CNG compressor packages, Compressor (Chinese), Vol 12, 2016 A.. read more →

ZCPPE has successfully developed a new generation torsional study program based on time-domain analysis method for resolving torsional vibration problems of reciprocating compressor packages.  The new program integrates the following functions: Input and output file management Calculation and presentation of torsional natural frequencies and modal shapes of systems Determination and presentation of Campbell diagram to.. read more →

In December 2015, ZCPPE successfully conducted a skid study on a four-throw and five-stage compressor package for Zhanwang Inc. using ANSYS FEA software. The scope of work includes: (1) Assess the strength and stability of the compressor skid for lifting and transportation operating; (2) Evaluate the dynamic forced responses of the compressor skid subject to.. read more →

In October 2015, ZCPPE successfully conducted a piping stress analysis for 20.0 MMBTUH Hot Oil Heater Package as per ASME B31.3 for Petro –Tech, Calgary, AB, Canada. The scope of work includes: (1) Calculate the piping stress and displacements resulting from the operating condition loads, including pressure, temperature, weights, and PSV reaction loads; (2) Calculate.. read more →